All funds in place for 1.5-GW Al Ajban solar project in Abu Dhabi
Sep 18, 2024 8:34 CESTSaudi Arabia’s ACWA Power Co (TADAWUL:2082) is set to launch commercial operations at a 300-MW solar project in Dubai which is part of the flagship Mohammed bin Rashid Al Maktoum solar park.
In a stock market filing, the Riyadh-based developer said on Thursday that the project company has been granted the commercial operation certificate of Phase C of the Shuaa Energy 3 project.
The complete plant achieved commercial operation with a total capacity of 900 MW, ACWA Power said.
The Saudi company owns a 24% stake in Shuaa Energy 3 project.
When fully operational, the entire Mohammed bin Rashid Al Maktoum Solar Park will have a capacity of 5 GW, to be installed at a total cost of AED 50 billion (USD 13.61bn/EUR 12.53bn). The huge complex is planned to be fully commissioned by 2030.
All funds in place for 1.5-GW Al Ajban solar project in Abu Dhabi
Sep 18, 2024 8:34 CESTSingapore's Gstar plans 2-GW solar module factory in UAE
Aug 30, 2024 9:39 CESTIberdrola inaugurates 496-MW Saint-Brieuc wind farm offshore France
Sep 19, 2024 16:25 CESTNacap to build hydrogen pipeline for AGA’s Aussie green ammonia project
Sep 19, 2024 16:03 CESTKKR fund increases tender offer price for Greenvolt
Sep 19, 2024 15:32 CESTStatkraft connects 44.5-MW solar farm to grid in Spain
Sep 19, 2024 15:28 CEST